Completion
Production
Everything done after reaching total depth to bring a well into production: perforating the casing, stimulating the formation (acid or frac), running tubing and packers, and installing downhole equipment.
Production
Everything done after reaching total depth to bring a well into production: perforating the casing, stimulating the formation (acid or frac), running tubing and packers, and installing downhole equipment.